Based on our experience with the Georgia Safe Dams Program, Carter Engineering was enlisted to design 10 large ponds for a northeast Georgia cattle farm. After developing the master site plan and surveying the property, we developed an irrigation system that covers approximately 500 acres and managed all construction and contractors as it was being built.